OEM manufacturer Track Roller 320d – Komatsu excavator undercarriage part PC200 track/bottom roller made in china – Heli
OEM manufacturer Track Roller 320d – Komatsu excavator undercarriage part PC200 track/bottom roller made in china – Heli Detail:
roller shell material:50Mn/45#
surface hardness:HRC48-58
Quench depth:>7mm
Roller shaft material:45#
Surface hardness:HRC48-58
Quench depth:>2mm
Collar material:QT450-10
Weight:41kg
Installation size:310mm,110mm
Features and requirements
The function of the track roller is to transmit the weight of the locomotive unit to the ground and roll on the track. In order to prevent derailment, the track roller should also be able to prevent the crawler from causing lateral relative movement to it.
track roller often work in mud, water, ash and sand, and bear strong impacts. The working conditions are extremely bad and the rims are easy to wear.
The requirements for the track rollers are: wear-resistant rims, reliable bearing seals, and low rolling resistance.
TRACK ROLLER |
|||||||||
KOMATSU |
PC30 |
CAT |
E324 |
DOOSAN |
DH220-9 |
SUNWARD |
SUNWARD50 |
806 |
|
|
PC40 |
|
E324 |
|
DH300 |
|
SUNWARD60./65 |
LIUGONG |
LIUGONG906 |
|
PC45 |
|
E325/325 |
|
DH360/400 |
|
SUNWARD70 |
|
LIUGONG150 |
|
PC50uu |
|
E330 |
|
DH500 |
|
SUNWARD230 |
|
LIUGONG200/925 |
|
pc55/pc50/PC56 |
|
E345 |
HYUNDAY |
R55 |
KUBOTA |
KUBOTA35 |
|
LIUGONG936 |
|
PC60-6 |
|
E350 |
|
R60/R60-5/-7 |
|
KUBOTA60/50/55 |
|
YANMAN55 |
|
PC60-7 |
|
E375 |
|
R80 |
|
KUBOTA85 |
|
YANMAN75 |
|
PC60-7 |
|
E385 |
|
R130/R150 |
|
KUBOTA161 |
|
ZY200 |
|
PC100 |
|
E390 |
|
R200/225-7 |
|
KUBOTA155 |
|
ZY300 |
|
PC200 |
KOBELCO |
SK55 |
|
R275-9 |
|
|
|
JCB8056 |
|
PC300/-5 |
|
SK60-3/5 |
|
R290/R305 |
|
TAKEUCHI150 |
|
JCB220 |
|
PC400/PC450 |
|
SK60-8 |
|
R370 |
|
TAKEUCHI160/TAKEUCHI60 |
|
60 |
|
PC650-8 |
|
SK100 |
|
R485 |
|
TAKEUCHI171/175 |
|
65/60 |
|
PC650-5/750 |
|
SK140 |
YUCHAI |
CY35 |
CASE |
CASE35 |
|
Ishikawa island50/60 |
|
PC800 |
|
SK200 |
|
CY60 |
|
CASE55 |
|
210 |
|
PC1250 |
|
SK230 |
|
CY85 |
|
CASE75 |
|
60 |
HITACHI |
EX55 |
|
SK270 |
|
CY135 |
|
CASE360 |
|
85 |
|
EX60 |
|
SK330/SK350 |
VOLOV |
EC55B |
RAY WALTER |
RAY WALTER60 |
|
Ishikawa island100 |
|
ZAX70/EX70 |
|
SK450/460 |
|
EC80 |
|
RAY WALTER85 |
|
Ishikawa island50/60 |
|
EX100 |
SUMITOMO |
SH60 |
|
EC140 |
|
RAY WALTER150 |
|
Ishikawa island135 |
|
EX200-2/-5 |
|
SH120 |
|
EC210 |
LIEBHERR |
LIEBHERR914 |
|
60 |
|
EX300 |
|
SH120A3 |
|
VOL210(NEW) |
|
LIEBHERR924 |
|
XCMG370 |
|
ZAX330 |
|
SH200/SH280 |
|
EC290 |
|
LIEBHERR944 |
|
XCMG700 |
|
EX400/DX380 |
|
SH220 |
|
VOL290(NEW) |
|
LIEBHERR944SME |
|
CX800 |
|
EX550 |
|
SH300SH340 |
|
EC360 |
|
LIEBHERR974 |
|
SWZ216D |
|
ZAX650 |
|
SH350 |
|
VOL360(NEW) |
SANY |
SANY65 |
||
|
ZAX750 |
|
SH450 |
|
EC460 |
|
SANY215 |
||
|
ZAX870 |
|
SH460 |
|
EC700/ex800 |
|
SANY335/365 |
||
|
EX1100 |
DAEWOO |
DH35 |
KATO |
HD250/HD307 |
|
SY405 |
||
|
EX1200-6 |
|
DH55/DH60 |
|
HD450 |
|
SY465/485 |
||
CAT |
E305.5/E55 |
|
DX60 |
|
HD770/HD700 |
|
8360 |
||
|
E70B/E307 |
|
DX60-9 |
|
HD1023 |
|
8330 |
||
|
E70B |
|
DH80 |
|
HD1250/1430 |
|
8250/8220 |
||
|
E312/E100 |
|
DH130/150 |
|
HD2045 |
|
815 |
||
|
E320/E200B |
|
DH220 |
SUNWARD |
SUNWARD50 |
|
808 |
Product detail pictures:









Related Product Guide:
Assume full accountability to satisfy all demands of our consumers; reach ongoing advancements by endorsing the expansion of our purchasers; come to be the final permanent cooperative partner of clients and maximize the interests of clientele for OEM manufacturer Track Roller 320d – Komatsu excavator undercarriage part PC200 track/bottom roller made in china – Heli , The product will supply to all over the world, such as: Malawi, Nicaragua, Egypt, With a wide range, good quality, reasonable prices and stylish designs, our products are extensively used in this field and other industries. We welcome new and old customers from all walks of life to contact us for future business relationships and achieving mutual success! We welcome customers, business associations and friends from all parts of the world to contact us and seek cooperation for mutual benefits.

The sales manager is very patient, we communicated about three days before we decided to cooperate, finally, we are very satisfied with this cooperation!
